Construction site waste handling and treatment

We collect, sort and recover construction site waste. The aim? Conserve resources, mitigate environmental impact and reduce costs for the industry and construction and public works sectors
centre de tri des déchets de Veolia à Vitrolles

Concrete, wood, plastic, framing, asbestos, metals and even chemicals are all types of waste found on construction, renovation and demolition sites.

This construction site waste is a major issue in the world of recycling. Fly-tipping and poor sorting at source means this type of waste does not receive proper treatment.

Site de récupération déchets de chantier Lingostière


Construction waste accounts for half of solid waste generated in the world each year.

Source: Transparency Market Research

In Europe, the Directive 2008/98/EC and France’s Energy Transition for Green Growth law of 18 August 2015, set the target of recovering 70% of construction site waste. Worldwide, site waste management regulations are being gradually introduced.

Giving construction site waste a second life by ensuring it is recycled and reused saves costs and resources and reduces environmental impacts.
 

An optimized construction site waste management plan

As a global reference for waste recycling and management, we provide our customers with the guarantee that all their site waste will undergo compliant treatment. This procedure involves several steps:

  • Site waste removal in special containers
  • Waste identification and weighing
  • Sorting recoverable materials (plastic, scrap metal, board, wood, etc.) for transportation to material recycling facilities
  • Separation of hazardous construction site waste (asbestos, solvents, paints, etc.) for treatment compliant with the regulations
  • Separation and recovery of all other waste, mainly inert material, in several fractions (sand, concrete, etc.)
  • Provision of tracking dockets to ensure site waste traceability.

We are also trialing a new solution to recover mineral waste. After a characterization phase, the mineral waste is treated and ground, before being added to a mixture of recycled plastics where it acts as a color additive and mineral filler. The new material created could be used to create plastic objects and in the production of masterbatches for plastics manufacturers (solid additives used to color plastics and provide them with new properties).

 

  • You reduce your environmental footprint
     
  • You minimize your costs
     
  • You comply with regulations

What are the benefits for you as an industrial or construction and civil works professional?

centre de revalorisation déchets de chantier à Vitrolles

We did it!

Brittany

France

Brittany’s first construction waste sorting center

Since September 2018, we have partnered with the employment integration network Envie and the construction, property and energy group Legendre to recover its construction site waste by installing a sorting center in its industrial park.

Paris

France

Recover construction waste from the Paris law courts

Bouygues Bâtiment Île-de-France contracted us for our construction site waste recovery expertise. Our teams worked in shifts to adapt to the site’s working hours and collect the waste and avoid clogging up the site.

Nice

France

Recovering more than 75% of construction site waste in our sorting center in Nice

In Nice, we treat the construction waste produced by the region’s construction professionals. Using high-performance equipment, our center is able to recover more than 75% of the waste.